§ 60.2700. How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits?
221 words·~1 min read·
/us/cfr/t40/s§ 60.2700·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)You must conduct a performance test, as required under §§ 60.2670 and 60.2690, to determine compliance with the emission limitations in table 2 of this subpart and tables 6 through 9 of this subpart, to establish compliance with any opacity operating limits in § 60.2675, to establish the kiln-specific emission limit in § 60.2710(y), as applicable, and to establish operating limits using the procedures in § 60.2675 or § 60.2680. The performance test must be conducted using the test methods listed in table 2 of this subpart and tables 6 through 9 of this subpart and the procedures in § 60.2690. The use of the bypass stack during a performance test shall invalidate the performance test.
(b)As an alternative to conducting a performance test, as required under §§ 60.2690 and 60.2670, you may use a 30-day rolling average of the 1-hour arithmetic average CEMS data, including CEMS data during startup and shutdown as defined in this subpart, to determine compliance with the emission limitations in Table 1 of this subpart or Tables 5 through 8 of this subpart. You must conduct a performance evaluation of each continuous monitoring system within 180 days of installation of the monitoring system. The initial performance evaluation must be conducted prior to collecting CEMS data that will be used for the initial compliance demonstration.
Connections4 cite this
Cited by 4 sections
Citation graph
cites case law
§ 60.2700
How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits?
Fed. Reg.×4
Cites 0Cited by 4 across 1 source